FCT Flames supplied a turn-key stadium cauldron to the 22nd Central American and Caribbean Games, held in Veracruz, Mexico in 2014. FCT was the prime contractor and had the cauldron support structure manufactured in the UK by Stage One, while FCT supplied all of the gas equipment including burner, gas valve train and control system. The base was a combination of stainless steel and GRP finished in a brushed stainless steel look.