Customer: KaTri on Behalf of XXVII World Summer Universiade 2013
Description: FCT Supplied the Cauldron Tulip Structure and Burner System located 55m above the stadium stage on a specially constructed pyramid. Running on natural gas, FCT supplied the valve train, control system and specially designed burner system.