Portfolio

Category
  • All
  • Adelaide Convention Centre
  • Athens 2004
  • Athens 2004
  • Azerbaijan 2017
  • Baku 2015
  • Baku 2015
  • Beijing 2008
  • Beijing 2008
  • CUB Pub Reopening Ceremony
  • Doha 2006
  • Doha 2006
  • Law Enforcement Torch Run
  • London 2012
  • London 2012
  • PanArab 2011
  • PanArab 2011
  • Rio 2007
  • Rio 2007
  • Sochi Winter Games 2014
  • Sochi Winter Games 2014
  • Special Olympic Australia
  • Sydney 2000
  • Sydney 2000
  • Toronto 2015
  • Toronto 2015
  • Turkmenistan 2017
  • Universiade Kazan 2013
  • Universiade Kazan 2013
  • Various Projects
  • Various Projects
  • Veracruz 2014
  • Veracruz 2014
  • YOG Singapore 2010
  • YOG Singapore 2010

Rio Olympics 2016

Customer: Ceremonias Cariocas 2016 Description: FCT Flames supplied two cauldrons, or...read more

Islamic Solidarity Games Azerbaijan 2017

FCT Flames supplied a unique ‘fire on water’ effect during the...read more

Special Olympic Australia – National Games Adelaide 2018

The Special Olympics National Games is an inspiring event that sees...read more

Law Enforcement Torch Run 2018

Australian Law Enforcement Agencies give up the time and energy to...read more

FCT Flames provides WOW factor to an incredible international icon – the Adelaide Convention Centre.

Australia’s first convention centre has been reborn as the nation’s newest,...read more

2017 Asian Indoor and Martial Arts Games

2017 Asian Indoor and Martial Arts Games FCT Flames was proud...read more

Sydney Olympics Torch

Client: Sydney Olympic Organising Committee (SOCOG) Description FCT was commissioned by...read more

Sydney 2000 Olympic Games Cauldron and Relay Torch.

Client: Sydney Olympic Organising Committee Description: FCT and the University of...read more

The Cauldron of the Sydney 2000 Olympic Games.

Client: Sydney Olympic Organising Committee. Description: FCT Flames is a provider...read more

Olympic Games Cauldron – Overflow Park.

Customer: Olympic Coordinating Agency/Sydney Thiess Company Description: After the Sydney 2000...read more

Olympic Rings of Fire.

Client: Jack Morton/ATHOC, Athens The Olympic Rings of Fire was an...read more

The Cauldron at the stadium of the 2004 Athens Olympic Games.

Client: AKTOR /ATHOC The main stadium cauldron is the centre piece...read more

Athens Olympic Torch Relay

Client: ATHOC/Athens Coca-Cola Description:  The key event in the build up...read more

Doha Sports City Tower

Client: Midmac – Six Construct JV Description: Guidance for burners, control...read more

Cauldron for the Doha Main Stadium.

Client: David Atkins Enterprise Description: FCT Flames provided guidance during the...read more

Doha Relay Torch.

Client: Doha Asia Organising Committee Description: FCT provided the manufacturing, testing,...read more

Rio de Janeiro Stadium Cauldron

Customer: FiveCurrents (formerly The Givens Company) Description: Complete cauldron (including all...read more

Beijing Olympic Games

Client: Hong Kong Jockey Club Description: Burner, valve train and control...read more

Wagner’s “The Ring Cycle”

Client: State Opera of South Australia Description: FCT Flames, together with...read more

Adelaide Festival of Arts

Description: The Adelaide Festival of Arts 2004 included an area known...read more

KI Bonfire – South Australia

Description: FCT Flames was asked by a landscape architect to design...read more

Hariri Memorial Flame

Client: Medcom Description: Permanent installation of burner, valve train and control...read more

Wafi City Mall – Khan Murjan Flame and Hotel Garden Flame

Client: MKM Description: Burner system design, test, manufacture, install and commission.

Universiade Kazan 2013

Client: KaTri on Behalf of XXVII World Summer Universiade 2013 Description:...read more

2011 Pan Arab Games

  Client: David Atkins Enterprise Description: FCT supplied the Stainless Steel Structure and Crinkle...read more

Youth Olympics Singapore 2010

Client: YOG 2010 Description: The 2010 Summer Youth Olympics were the...read more

London Olympics 2012

Client:  LOCOG 2012 Description: FCT supplied the 205 burner systems that...read more

Sochi Winter Games 2014

Client: Stage One on behalf of Sochi Winter Games 2014. Description:...read more

The first European Games in Baku.

Description: FCT Flames provided over 600 meters of custom-designed burners to create...read more

The first European Games in Baku.

Client: Baku European Games Operations Committee (BEGOC) Description: FCT Flames supplied...read more

The first European Games in Baku.

Client: Baku European Games Operations Committee (BEGOC) Description: FCT Flames provided...read more

22nd Central American and Caribbean Games – Veracruz, Mexico

FCT Flames supplied a turn-key stadium cauldron to the 22nd Central...read more

Toronto PanAM 2015

Toronto PanAm 2015FCT Flames was awarded the contract to supply 2...read more

Toronto PanAM 2015

FCT Flames was awarded the contract to supply 2 cauldrons for...read more

22nd Central American and Caribbean Games – Veracruz, Mexico

FCT Flames supplied a turn-key stadium cauldron to the 22nd Central...read more

Baku 1st European Games

Client: Baku European Games Operations Committee (BEGOC) Description: FCT supplied the...read more

Baku 1st European Games

Client: Baku European Games Operations Committee (BEGOC) Description: FCT Flames supplied...read more

Baku 1st European Games

Customer: Baku European Games Operations Committee (BEGOC) Description: FCT Flames supplied...read more

Sochi Winter Games 2014

Customer: Stage One on behalf of Sochi Winter Games 2014 Description:...read more

London Olympics 2012

Customer: LOCOG 2012 Description: FCT supplied the 205 burner systems that...read more

Youth Olympics Singapore 2010

Customer: YOG 2010 Description: The 2010 Summer Youth Olympics were the...read more

PanArab Games 2011

Customer: David Atkins Enterprises Description: FCT supplied the Stainless Steel Structure and Crinkle Burner for...read more

Universiade Kazan 2013

Customer: KaTri on Behalf of XXVII World Summer Universiade 2013 Description:...read more

Wafi City Mall – Khan Murjan Flame and Hotel Garden Flame

Customer: MKM Description: Burner system design, test, manufacture, install and commission.

Hariri Memorial Flame

Description: On the third anniversary of the assassination of Late PM...read more

KI Bonfire – South Australia

Description: FCT Flames was asked by a landscape architect to design...read more

Adelaide Festival of Arts

Description: The Adelaide Festival of Arts 2004 included an area known...read more

Wagner’s “The Ring Cycle”

Customer: State Opera of South Australia Description: FCT Flames, together with...read more

Beijing Olympic Games

Customer: Hong Kong Jockey Club Description: Burner, valve train and control...read more

Rio de Janeiro Stadium Cauldron

Customer: FiveCurrents (formerly The Givens Company) Description: Complete cauldron (including all...read more

Doha Relay Torch

Customer: DAGOC Description: Torch and Portable Cauldron Manufacture, lab testing, prototyping,...read more

Doha Main Stadium Cauldron

Customer: David Atkins Enterprises Description: Burner, valve train and control systems...read more

Doha Sports City Tower

Customer: Midmac – Six Construct JV Description: Burner, valve train and...read more

Athens Olympic Relay Torch

Customer: Coca-Cola/ATHOC, Athens Description: The key event in the build up...read more

Athens Stadium Cauldron

Customer: AKTOR/ATHOC, Athens The main stadium cauldron is the centre piece...read more

Olympic Rings of Fire

Customer: Jack Morton/ATHOC, Athens. The “Olympic Rings of Fire” was an...read more

Overflow Park Cauldron

Customer: Olympic Coordination Authority/Thiess, Sydney Description: Following the completion of the...read more

Sydney Stadium Cauldron

Customer: SOCOG, Sydney Description: FCT supplied the burner system, valve train...read more

Sydney Portable Cauldron

Customer: SOCOG, Sydney Description: Following on from the contract to supply...read more

Sydney Olympics Torch

Customer: SOCOG, Sydney Description: FCT was commissioned by the Sydney Organising...read more